Building Advice

What a Building Permit Costs: Truro, Colchester, Pictou, Halifax and East Hants

October 22, 2026 ·
Renovated rental kitchen with white shaker cabinets and stainless appliances in Bible Hill

Two houses of the same size, built the same year, ten minutes apart, can cost different amounts in permits and go through completely different offices. Nova Scotia has no single municipal permit system. Each town and each rural municipality sets its own fees and runs its own process, and the first job on any build is working out which office the lot belongs to.

Here is how it compares across the areas JGC Construction works in, as posted in September 2026. Fee schedules change, so treat these as a guide and confirm the current numbers when you apply.

Town of Truro

Inside town limits, the Town of Truro charges 6 cents per square foot for new residential construction, with a $25 minimum. Applications go to the Planning and Development department at 695 Prince Street, by email or in person.

Truro asks for one complete set of scaled drawings: site plan with lot dimensions, elevations showing exterior finishes, floor plans with room dimensions, sections showing materials and grades, and structural drawings including foundation and roof plans. That is a real drawing set, not a sketch. Budgeting for a designer or engineer to produce it is part of the cost of building in town. JGC settles the floor plan with you early in the process, which gives the designer a clear starting point.

Municipality of Colchester

Outside Truro, in Bible Hill, Valley, Onslow, Tatamagouche, Debert, Great Village and the rural roads through the county, the Municipality of Colchester charges a $25 development permit fee plus 10 cents per square foot for residential construction.

Colchester runs development permits and building permits as two steps, the development permit first. Applications, payment and status are handled through the municipality’s online system. Along with plans and a plot plan, the application needs septic or sewer approval and driveway approval, and those two are where rural applications stall. The Colchester County guide walks through them in order.

Municipality of Pictou County

The rural parts of Pictou County are handled by building officials at 46 Municipal Drive in Pictou. Applications run by appointment rather than over a counter: email buildingpermits@munpict.ca or call 902-485-4588 to book a session to finalize the application. Fees are not published in the same form as Colchester’s, so ask for the current schedule when booking.

The towns of New Glasgow, Stellarton, Westville, Trenton and Pictou each issue their own permits for lots inside their boundaries. More on the town-versus-county split in the Pictou County guide.

Halifax Regional Municipality

HRM covers everything from the peninsula to Middle Musquodoboit, and a building permit is required for any new dwelling. HRM’s fees are charged per square metre of floor area rather than per square foot, and vary by whether the floor is above grade, a shallow basement or a deeper one. The municipality also has related permits that carry their own applications, including lot grading, water and driveway or right-of-way permits. HRM publishes current fees and requirements at halifax.ca.

On serviced lots in HRM, budget separately for Halifax Water’s regional development charge, which is a per-unit charge and is a much larger number than the building permit itself.

Municipality of East Hants

Enfield, Elmsdale, Lantz, Milford and Shubenacadie are in East Hants, not HRM, with a permit office in Elmsdale and a set of mandatory inspections at fixed stages of construction. East Hants has been one of the fastest-growing parts of the province, and has used permit fee measures to encourage additional dwelling units. The Halifax County guide explains where the HRM and East Hants line falls.

What the permit fee does not cover

The permit fee is rarely the expensive part. On a rural lot, the approvals around it usually cost more:

  • A lot assessment and septic design by a Qualified Person (see buying a rural lot)
  • The septic system itself, which varies widely depending on what the soil allows
  • A drilled well and water testing
  • Driveway and culvert work where the driveway meets a road
  • Power service to the building, which on a long rural lot is not a small line item

On a serviced town lot, the equivalents are water and sewer connection charges and development charges. Either way, the line labelled “permits” in an early budget should be read as “approvals”, and it should be a four-figure number, not a two-figure one.

The part that costs the most is time

Every one of these offices reviews plans, and none of them does it instantly. A septic assessment that comes back needing an engineered system adds weeks. A development permit that turns up a setback problem can send a house plan back to the drawing stage, which happens most often on waterfront lots. None of that is unusual and none of it is anyone’s fault, but it is why builds that started their paperwork in February are framing in May and builds that started in May are still waiting.

JGC Construction works in Colchester, Pictou and Halifax counties and deals with these offices regularly, on everything from custom homes to additions and decks, which need permits too. As part of its process, JGC handles the permit applications for its clients. To talk through what a specific lot will need, get in touch. There is more detail by county in the guides to building in Colchester County, Pictou County and Halifax County.

Tags:
J
JasonC
JGC Construction - Nova Scotia's custom home building specialists.